Skip to content
AlroundConverter

Handover protocol for a flat or property

General sample record of a flat handover with meters, keys and room condition.

Your entries stay in your browser and are not saved or uploaded.Word (DOCX) · PDF

This is a general sample and not legal advice. Legal requirements differ from country to country. Check whether it meets the rules where you live and get professional advice if in doubt.

Your details

Table

MeterNumberReading

Table

KeyQuantity

Table

RoomConditionDefects

For PDF, choose “Save as PDF” as the printer in the print dialog.

Your entries stay in your browser and are not saved or uploaded.

How to use this template

  1. 1

    Fill in your details in the form – the preview updates instantly.

  2. 2

    Adapt the example text and the table rows to your situation.

  3. 3

    Download the template as an editable file or save it as PDF via the print dialog.

About this template

When a flat or property is handed over – at move-in or move-out – a written record helps avoid disputes later. This sample documents both parties, the address and date, the meter readings, the keys handed over and the condition of every room including any defects.

Walk through the property together, fill in the tables on site and have both parties sign. Adapt rooms and meters to the property and check the rules that apply where you live.

Tips

  • Do the handover in daylight and walk through every room together.
  • Take dated photos of defects and meters.
  • Describe defects precisely, e.g. "10 cm scratch on the kitchen door".
  • Count all keys, including mailbox and cellar keys.
  • Each party should keep a signed copy.

Frequently asked questions

Is a handover protocol mandatory?

That depends on your country and contract. Even where it is not required, a signed record is useful evidence of the condition at handover.

What if we disagree about a defect?

Note both views in the remarks. This is a general sample; seek professional advice if a dispute arises.